ST108 White Paper: Building Future-Ready Water Purification Systems for Sterile Processing
A complimentary strategic briefing for healthcare teams planning, evaluating or improving water systems used to process reusable medical devices (updated October 2026).
Water quality plays a critical role in the processing of reusable medical devices. ANSI/AAMI ST108:2023 establishes requirements for water used in medical device processing. Envirogen’s ST108 white paper explores why the performance of the complete water system matters for healthcare facilities.
Implementing ST108 involves more than selecting a reverse osmosis (RO) system. Healthcare facilities must also consider water distribution, system qualification, microbial control, testing, monitoring and ongoing maintenance to support consistent water quality and long-term operational reliability.
The briefing, Building Future-Ready Water Purification Systems for Sterile Processing, examines these practical challenges and provides insight for healthcare teams reviewing existing infrastructure, planning system upgrades or evaluating future investment.
Request your complimentary copy of the strategic briefing.
WHAT THE ST108 STRATEGIC BRIEFING COVERS
The briefing explores the key technical, operational and financial considerations involved in planning, upgrading and managing water systems for sterile processing.
- ST108 implementation: The water-quality requirements and wider responsibilities involved in system planning, testing and qualification, including the role of AAMI’s developing TIR119 implementation guidance.
- Water purification and system design: Treatment capacity, storage, distribution, operational needs and the limitations of existing infrastructure.
- Thermal sanitization and microbial control: How automated hot thermal sanitization can support a wider microbial-control strategy, and considerations when comparing approaches.
- Monitoring and lifecycle performance: Independent water testing, operational monitoring, traceability, maintenance, system reliability and longer-term operating costs.
- Real-world healthcare experience: Practical applications and customer perspectives, including The Ambulatory Surgery Center at St. Mary and One Brooklyn Health.
PLAN BEYOND INITIAL ST108 REQUIREMENTS
Water purification decisions can have long-term implications for sterile processing departments (SPDs), facilities teams, equipment reliability, operating costs and future capacity. The briefing examines why those decisions should consider the complete water system and its ongoing performance, not just the initial equipment purchase.
It draws on Envirogen’s engineering and service experience. Learn more about EndoTherm water purification systems or explore our wider healthcare water purification capabilities.
Request Whitepaper
Building future-ready water purification systems for sterile processing
Fill out the contact form
North America Head Office
Envirogen Technologies
700 Rockmead Drive, Suite 100
Kingwood, TX
77339
T: 877 312 8950
United Kingdom Head Office
Envirogen Group
Unit 9, Wimsey Way
Alfreton Trading Estate
Alfreton, DE55 4LS
T: +44 (0) 1773 441029
Europe Head Office
Envirogen Technologies bv
Penningweg 71
1507 DG Zaandam
The Netherlands
T: +31 75 204 7200